
At our first site we met up with biologists from the Massachusetts Department of Fish and Game to examine a fish ladder that had been recently constructed in conjunction with a new dam in Herring Brook. Unlike the makeshift wood ladder that had originally been in plac
e next to the old dam, this new Alaskan Steeppass ladder has much greater potential to aid fish passage during the herring spring migration. The dam, which creates a pond that serves a cranberry bog upstream, needed partial repairs and the fish ladder was completely rebuilt during the repair process. Prior to this project the dam was completely impassable for migrating fish and volunteers helped physically net the fish and transport them to trucks where they were driven upstream.Second Photo: Sara Grady and Kirstie Jones from the NSRWA, Brad Chase, Ed Clarke and Louis from Division of Marine Fisheries, Phil Costello Contractor at the newly installed fish ladder and repaired dam at the Gorham Mill Pond in Pembroke on the Herring Brook.
As we saw on this trip, fish ladders are essential for giving fish a migratory route over most dams. There is resistance to removing dams, which would be an easier and environmentally-preferable solution, due to aesthetic, economic, and historical reasons. At the second site we visited, Veteran’s Memorial Park Dam on the South River, we learned that during the wedding
season, (May - July), wooden boards in the dam are put in to raise the level of the pond for aesthetic purposes. This causes all the river’s flow to be directed down the fish ladder, making it impossible for fish to pass. The NSRWA, the Marshfield Conservation Agent, and the state fisheries biologists discussed recommendations for the park keepers to remove the boards for a certain period of time during the spring to allow the fish to pass and to stop flows out of a secondary pipe that exits the pond to avoid distracting the fish from heading for the ladder.At our next site upstream of the Veteran’s Park dam on the South River we visited the Chandler’s Pond Dam. No fish ladder currently exists, but during this meeting the possibility was discussed of constructing a new fish ladder in conjunction with a new bridge that is being planned on the site. The state biologists pointed out that from an engineering standpoint it would not be too difficult to incorporate these two projects so hopefully a new bridge for humans and a new ladder for fish will be the result of this project.
At the second Scituate fish ladder that we visited there is a lot more work to be done. This old ladder that accompanies the dam at Scituate’s larger reservoir on the First Herring Brook has some structural problems such as steep steps as well as debris blockage. Plans were made for local water department employees to work with state fisheries representatives to clear this debris to see if it is possible to return the ladder to some functioning capacity.



